Platform Lift Thorough Examination vs Servicing
In Great Britain, a platform lift used at work needs a LOLER thorough examination by a competent person, normally every six months, separate from its routine servicing.
Period hotel entrances often incorporate non-standard layouts and structural constraints that require bespoke accessibility engineering.
3D modelling helps visualise movement sequences, validate BS6440:2011 compliance principles and ensure safe integration into listed building environments.
Vertical retracting stair systems such as the Wellington Lift and Westminster Equality Act Lift provide discreet accessibility while maintaining the architectural character of historic hotel properties.
Additional learning is available via 3D Modelling in Lift Design and Bespoke Lift Options – 20 Minute Consultation.
Creating accessible entrances for listed hotels, period buildings and other historic hospitality venues requires a precision-led engineering process. Entrances often feature narrow porticos, irregular staircases, projecting stone details and vaulted spaces below ground level. These constraints demand careful assessment before selecting an appropriate lift solution.
Through detailed 3D modelling, engineers can evaluate turning space, pit depth, crush-risk zones and door sequencing requirements. This ensures the final design not only meets operational needs but aligns with Part M Building Regulations principles and Equality Act expectations around inclusive access.
Many traditional hotel entrances contain structural or geometric limitations such as:
Tight staircases or asymmetrical tread depths
Railings or window ledges that create crush zones
Subsurface vaulted cellars that restrict pit excavation
Limited landing space in front of entrance doors
Conservation rules that prevent modifying façades or gates
These make conventional surface-mounted lifts impractical. 3D simulations reveal whether dimensions fall short of BS6440:2011 internal platform requirements or whether alternative layouts could still achieve safe, user-friendly access.
Modern 3D tools enable engineers to test:
Wheelchair turning circles and approach routes
Standing-user movement, including PRM travellers with luggage
Rising barrier deployment and retracting stair movement
Safety-edge interactions near railings or stone ledges
“No-go zone” detection using scanners where necessary
Spatial clearance inside vaults or under treads
These simulations create a design-for-safety environment that identifies risks before installation begins. They also provide clear visuals for planning officers who require assurance that architectural character remains intact.
For more insight on simulation workflows, see 3D Modelling in Lift Design.
The Wellington Lift is ideal for hotels where users approach through a compact entrance and wheelchair-only access is required.
Benefits include:
No visual change to the entrance when the lift is stored
Minimal or no modification to railings or façade elements
Reduced impact on vaulted spaces beneath the steps
Fast, intuitive operation for staff and guests
It fits particularly well in listed hotel buildings where conservation teams prefer reversible interventions.
The Westminster Equality Act Lift is suited to historic hotels with diverse user profiles, including PRM guests who cannot climb steps.
Key features include:
Full-height rising barriers for standing-user protection
Automatic landing gates
Hidden platform integrated within the stair core
Broader turning space and usability envelope
This system supports Equality Act inclusive-access expectations, though it may require structural reinforcement or carefully planned pit depths depending on vaulting or brick arches.
A listed hotel approached our team with a challenging entrance layout:
A narrow historic gate
A projecting stone sill that created a crush hazard
Two active basement doors beneath the staircase
Only 65 mm safe standing space outside the main entrance doors
Vaulted brickwork limiting excavation depth
3D modelling revealed that a traditional platform lift would not achieve a compliant turning circle or protect users from identified crush risks. Two retracting stair strategies were tested:
Wellington configuration:
Suitable when wheelchair-only access is acceptable and where minimising structural impact on heritage fabric is a priority.
Westminster configuration:
Provided full PRM access with automated gates but required a deeper mechanical zone, carefully modelled around the vaulted ceiling.
The 3D walkthrough enabled the architect, hotel operator and conservation officer to understand each option clearly and select the pathway that balanced heritage preservation with user safety.
Our heritage-access designs are frequently approved because:
3D visuals demonstrate minimal visual impact
Material selections respect conservation guidelines
Safety documents show BS6440:2011-aligned risk design
Platform behaviour is clearly explained through movement sequences
Subtle integration protects the character of listed entrances
We also supply documentation to accompany planning submissions, helping applicants build confidence with conservation officers and Building Control teams.
To explore bespoke options and receive tailored guidance, see:
Bespoke Lift Options – 20 Minute Consultation
What pit depth is required for a Westminster Lift in a listed building?
Pit depths vary significantly. Many period hotels include vaulted subfloors that restrict excavation. 3D modelling allows engineers to determine a safe mechanical zone without compromising structural integrity.
Does a Wellington Lift require modifications to the façade?
Usually no. The system retracts into the existing stair volume, making it ideal where conservation conditions prohibit façade alterations.
Can retracting stair systems meet Part M accessibility expectations?
Yes. When designed with correct landing space, barrier height and turning geometry, systems can meet the intent of Part M for safe, dignified access.
How long does installation take?
Most retracting stair systems are installed within three to six weeks depending on groundwork requirements and planning conditions.
What safety measures protect guests from crush hazards?
Designs may incorporate rising barriers, safety edges and detection scanners where railings, window ledges or limited offsets create high-risk areas.
Can these lifts support daily public use in busy hotels?
The Westminster systems are designed for frequent operation in commercial hospitality environments.
What type of imagery should we use in this article?
Use images with descriptive alt text such as “3D model showing retracting stairlift integrated into period hotel entrance” to improve accessibility and SEO.
If you are evaluating accessible entrance solutions for a listed or historic hotel property, book a meeting with a Sesame Access Project Manager:
https://www.sesameaccess.com/book-a-meeting
In Great Britain, a platform lift used at work needs a LOLER thorough examination by a competent person, normally every six months, separate from its routine servicing.
A practical checklist for building teams to reconcile lift documents, operator training, outstanding actions and ongoing support before completing a bespoke lift handover.
A passenger lift may already serve the floor. Before specifying more equipment, identify the journey that still needs a solution and give the right specialist a clear brief.