Q1: Will fire officers accept reduced width when the lift is in use?
This corridor is intended as a tertiary route (not the primary theatre egress). With ~800 mm residual width during operation and the lift parked flush when not in use, acceptance typically hinges on occupancy calculations and the fire engineer’s judgement. The team agreed to consult Building Control and fire engineering early.
Q2: How much space is needed at the top step riser?
Plan for ~1400–1475 mm from the top step riser to provide safe access and a 1500 mm turning circle, while keeping clear of adjacent door swings (target ~300 mm offset).
Q3: What are the pit requirements?
The side section indicates a pit depth ~547 mm with ~840 mm behind the top step riser and ~1475 mm forward; an internal sump isn’t required here. Structural checks around party walls/foundations are still prudent.
Q4: Controls and user experience?
Key-controlled user fob for up/down, call stations at both landings, and an optional removable handheld post for hand-hold compliance—kept in a cupboard to maintain a clean aesthetic. An alert prompts staff/users if steps aren’t retracted after use.